post #1 of 1
Thread Starter 
MATERIALS NEEDED:

Fabric: Between 1.5 and 2 yards of fabric depending on the size; he most you will need is 2 yards, unless you are built very large.

Sewing machine and thread to match/contrast with the fabric.

Time: under 1 hour, even if this is your first project.

http://www.instructables.com/id/A-Si...-pouch--or-sl/